Coating of Transgaz gas pipelines
Romania
Sandblasting and protective coating on Transgaz gas pipelines at multiple locations across Romania, using high-performance Jotun systems.
A selection of our work.
Romania
Sandblasting and protective coating on Transgaz gas pipelines at multiple locations across Romania, using high-performance Jotun systems.
Iernut (RO)
Over 20,000 m³ of Layher scaffolding erected for works at the Iernut power plant (Termocentrala).
Rope accessDeva (RO)
Insulation, sandblasting and protective coating at height — up to 120 metres — carried out entirely by rope access.
Thermal insulationDublin (IE) · Stapelfeld (DE)
Supply and on-site installation of insulation materials for international projects — Coimec (Dublin) and LAB SA (Germany) — with high-quality thermal insulation systems.
Austria
Sandblasting works on a bridge using industrial rope access — safe access and high-quality surface preparation for the coating.
Heat tracingTasca (RO)
Heat tracing installation for reliable temperature maintenance and freeze protection of an industrial storage tank.
Fire protectionSatu Mare (RO)
Passive fire protection at Satu Mare International Airport using specialised Jotun fire protection systems, in line with project specifications.
Tell us what needs to happen. We assess the job and provide a no-obligation quote.
Discuss your project